Build approach

One design process. Two proven surfaces.

Asphalt and concrete are both core FlowTracks offerings. The right specification comes from the site, the riding goals, the project team and the conditions the finished track must handle.

These considerations guide design and construction. Final dimensions, materials and details are documented for each project rather than applied as universal numbers.

01 / Section

Site assessment

Existing conditionsReview grades, soils, vegetation, utilities, neighbouring uses and available footprint.
Construction accessPlan equipment, material and crew access before the layout is fixed.
Local requirementsCoordinate the project-specific approvals, engineering and procurement information the owner requires.

02 / Section

Subgrade, base and drainage

SubgradeRemove unsuitable material and prepare stable support based on observed site and soil conditions.
BaseSpecify and compact the granular structure for the selected surface, loading and local ground conditions.
Water managementShape positive drainage, protect low points and coordinate outlets so water does not collect on the riding line.

03 / Section

Geometry and rider access

FlowCoordinate rollers, transitions and banked turns so riders can carry momentum without pedalling.
ProgressionBalance approachable lines with room to build speed and skill where the footprint allows.
VisibilityReview sightlines, entries, exits, rest areas and circulation around the track.
Inclusive useConsider gradients, transitions, clearances and access routes for the riders the project intends to serve.

04 / Section

Asphalt surface

Material selectionChoose the asphalt specification with the project team for climate, intended use and local supply.
PavingCoordinate placement and compaction through curves and transitions to maintain the designed riding line.
Finish reviewCheck continuity, drainage, edges and surface consistency before handover.

05 / Section

Concrete surface

Material selectionChoose the concrete specification with the project team for climate, exposure and project requirements.
Pour sequencePlan reinforcement, joints and pours around the geometry and project-specific engineering.
Finish reviewCheck transitions, texture, drainage, joints and edges before handover.

06 / Section

Finish and handover

Quality reviewWalk the complete track, review riding lines and record items that need correction before opening.
Project recordsProvide the agreed drawings, product information and construction records for the owner’s files.
Care guidanceExplain inspection and maintenance needs for the selected surface and surrounding landscape.
Staff walkthroughReview the finished track and practical inspection points with the owner’s team.

Every project receives a surface-specific scope. Site investigation, applicable approvals and project engineering govern the final construction documents.